Kingspan

Kingspan pre-insulated duct system.

Kingspan PalDuct and PIRALU are lightweight, thermally efficient pre-insulated duct systems — up to five times lighter than conventional GI ductwork, for easier handling and faster installation.

Local accredited Fire-tested and SGBP-certified
≤0.023 W/mK Declared thermal conductivity at 10 °C, depending on the selected panel
20–30 mm Panel thickness options for different project requirements
4m × 1.2m Standard panel dimensions
How it works

Air distribution and insulation in one construction.

Pre-insulated ductwork combines air distribution and thermal insulation within a single lightweight panel system. Unlike conventional GI ductwork, which requires a separate insulation stage, the insulation is already built into the duct panel.

Each duct section is fabricated from rigid PIR panels faced on both sides with aluminium. The panels are cut, grooved, folded and sealed to form the required duct dimensions and fittings.

01 Panels are measured and cut

The PIR panels are measured, cut and grooved according to the approved duct dimensions and project drawings.

02 Duct sections are formed

The prepared panels are folded and assembled to create straight ducts, bends, transitions and other required fittings.

03 Joints are sealed

Profiles, connectors, adhesive, sealant and aluminium tape are used to join the sections and provide a secure, well-sealed duct system.

04 The ductwork is installed

The completed sections are suspended and connected to the ACMV equipment to distribute supply, return or fresh air throughout the building.

From panel to finished duct

Each duct section is precision-cut, bonded, formed and sealed to create lightweight, insulated and airtight ductwork. Select any photograph to open it at full size.

Benefits

Pre-insulated duct system benefits.

  • High thermal efficiency.
  • Up to five times lighter than GI ductwork.
  • Faster and easier installation.
  • No additional insulation requirement.
  • Reduced labour and site congestion.
  • Moisture-resistant PIR construction.
  • Low air leakage through sealed joints.
  • Clean finishing with easy modification.

Kingspan PalDuct

A lightweight, thermally efficient pre-insulated duct system with a PIR core density of 45 kg/m³, designed for internal ACMV air distribution.

Kingspan PIRALU

A lightweight pre-insulated duct system with a PIR core density of 35 kg/m³, featuring antimicrobial-treated foil surfaces, designed for internal ACMV air distribution.

A formed Kingspan pre-insulated duct section between stacks of PalDuct (white core) and PIR-ALU (blue core) panels.
Technical characteristics

Two panel systems, selected to suit the project.

Both systems use aluminium-faced rigid PIR panels, but the final selection should be based on the required thermal performance, installation conditions, certification requirements and project specifications.

Construction
PIR core with aluminium facings
Air services
Supply, return and fresh air
PalDuct
45 kg/m³; 20 mm; 0.020 W/mK
PIRALU
35 kg/m³; 20/30 mm; 0.023 W/mK
Moisture protection
Closed-cell core with vapour barrier
Certification
Fire-tested and SGBP-certified

Panel take-off, fitting schedules and full technical data are issued on enquiry rather than published. Request the data sheet.

Panel construction compared: PalDuct, 20 mm PIR core at 45 kg/m3, 0.020 W/mK; PIR-ALU, 20 or 30 mm core at 35 kg/m3, 0.023 W/mK.
Panel construction and performance. PalDuct carries the denser core and the lower thermal conductivity; PIRALU adds a second thickness and an antimicrobial facing.
Accessories

The same accessory set covers both panel systems, so a site is not carrying two inventories.

  • F profile, aluminium.
  • H profile, aluminium.
  • U profile, aluminium.
  • Corner piece.
  • Tiger connector.
  • Silicone sealant.
  • Panel glue.
  • Aluminium duct tape.
  • Panel tool box.
Applications

Where pre-insulated ductwork is used.

Pre-insulated duct systems are suitable for new construction, renovation and A&A projects across a wide range of building types.

Commercial & residential

  • Offices and retail developments
  • Hotels and serviced apartments
  • Condominiums and mixed-use buildings

Institutional & specialist

  • Schools and healthcare facilities
  • Public buildings and attractions
  • Dry laboratories and data centres

Industrial & retrofit

  • Factories and production facilities
  • Warehouses and workshops
  • Renovation and A&A projects
Project references

Buildings across Singapore fitted with PalDuct or PIRALU ductwork. Select any photograph to open it at full size.

Certified Fire-tested to SCDF requirements and SGBP-certified, fabricated in YITAC's own workshop
BCA  ·  BizSafe Star  ·  ISO 9001  ·  OHSAS 18001
Downloads

Catalogue and certification.

Connected work

Where duct fits the wider system.

Solution

Twenty80 PDV

Where the answer is no ductwork at all — passive displacement removes the airside entirely.

View solution
Service

Energy Audit & OSE

Air distribution inspected against design intent as part of the assessment.

View service
Our Partners

Kingspan

The manufacturer behind the PalDuct and PIRALU panel systems.

View partners

Send us the duct schedule and we will quote the panel take-off.