Assess
Diagnose energy use and system gaps.
Sustainability consultancy, engineering delivery, integrated energy solutions and verified performance — from one accountable team.
One accountable partner from assessment to sustained performance.
Diagnose energy use and system gaps.
Turn goals into roadmaps and certification action.
Engineer, integrate and commission solutions.
Measure and continuously optimise performance.
Gap analysis, baseline and priorities.
Design, supply, install and commission.
Measure and verify actual performance.
Monitor and continuously improve.
Measurement & verification, monitoring and preventive optimisation on projects where this scope applies.
We lead with the outcome, then the system. Every solution below exists because it solves a measured problem in a real building.
Efficient, low-draft comfort through passive displacement.
View solution
Passive Displacement Cooling (PDC) operates similarly to conventional active displacement cooling. Cooled air is supplied at floor level, while warm air rises and is extracted at ceiling level.
To accommodate different design constraints and space requirements, three main models are available:
Heat generated by occupants, lighting and equipment warms the room air. The warmer, lighter air rises and moves towards the PDV coil.
Chilled water flows through the coil and absorbs heat from the surrounding room air. As the air is cooled, it becomes denser.
The cooler, denser air descends through the insulated PDV casing and is discharged through the air grille.
Select any image to open it at full size.
More than a decade of passive displacement work in Singapore, largely in education, institutional, office and sports facilities.
The findings hand straight to Engineering & Integration, and the measures they name are the ones Measurement & Verification later proves.
Editor-authored HTML sits inside the prose scope, so headings, lists and quotes take the article styles without restyling the page around them.
Measure before and after every intervention so the saving is proven rather than promised.
YITAC engineering principle
Closing paragraph with a link.
Start with the building challenge, not the product list.
Talk to us