Independent measurement and verification — MV2, BMS trending and reporting a finance team can sign off.
Before a project starts, not after. A saving claimed without an agreed baseline and boundary cannot be verified later.
M&V plan · metering and instrumentation · trending and data collection · verification reporting.
Verified performance sets the reference Optimisation holds the building against, and flags the drift worth acting on.
The comparison basis is agreed in writing before any work happens — which is what separates verification from a favourable reading.
Independent verification that delivers confidence in savings and performance.
Verify actual VRF capacity and COP on site, not on a datasheet.
Starting a project that will need its savings verified?